Let's Power Your Efficiency

Reach out for site audits, harmonic testing, and high-quality power factor correction solutions.

Visit Us

PS Power Controls

No: 3/4, Thirumalai Raja Street,

Aynavaram, Chennai - 600023.

Tamil Nadu, India.

Call Us

Sales: +91 98408 75082

Service: +91 98408 15294

Admin: +91 99401 75082

Office: 044 4555 2497

Email Us

General: info@pspowercontrols.com

Sales: harish@pspowercontrols.com

Support: harish@pspowercontrols.com

Locate Us on Google Maps

Submit Enquiry

Fill out the form below and our experts will get back to you within 24 hours.

Technical Specifications & Industrial Applications

Our engineering solutions are specifically designed to meet the rigorous demands of modern industrial electrical networks. By maintaining unity power factor and mitigating harmonic distortion, we help facilities reduce their carbon footprint and eliminate utility penalties.

Key Performance Metrics

  • Accuracy: Class 1.0 energy monitoring precision.
  • Protection: Integrated protection against over-voltage and thermal runaway.
  • Reliability: Designed for continuous 24/7 operation in high-ambient temperatures.
  • Standards: Fully compliant with IEEE 519-2014 harmonic guidelines.

Application Verticals

  • Textile Mills & Spinning units with heavy VFD loads.
  • Hospital and Data Center infrastructure requiring clean power.
  • Automobile fabrication units and heavy engineering plants.
  • IT Parks and Commercial complexes seeking energy incentives.

Pro Tip: Regular Power Quality audits can extend the lifespan of your transformers and sensitive electronics by up to 30%. Contact PS Power Controls Chennai for a professional site survey.

Copyrights © 2026 All Rights Reserved www.pspowercontrols.com

Project Support and Site Coordination

PS Power Controls provides consultation, manufacturing support, and commissioning assistance for power factor correction and harmonic mitigation projects. Our support process is designed for plant managers, electrical consultants, and contractors who need dependable timelines and technically aligned recommendations.

For quick coordination, include site location, transformer and DG details, major nonlinear loads, and your present PF trend from utility bills. This allows our team to suggest technically suitable options and implementation sequence with reduced trial-and-error.